Return to My Great Home index page The online resource for manufactured and modular home owners Foremost Insurance Group

Fix-It Guide
> Advice from the experts
> Hiring good help
> Manufactured home diagram
> Preventive maintenance

Exterior
> Adding attachments to your home
> Coating your roof
> Drafts and leaks
> Identifying a roof leak
> Keep your siding looking new
> Pest control
> Repairing a metal roof
> Replacing exterior windows
> Shingle repair
> Skirting and belly boards
> Tie-downs and anchors

Interior
> Covering up ceiling stains
> Fixing damaged wall panels
> Home heating maintenance tips
> Installing a fireplace or woodstove
> Installing drywall
> Moisture control
> Patching holes in drywall

> Preparing walls for paint or paper
> Reparing vinyl flooring
> Replacing a ceiling panel
> Water heater maintenance

Seasonal
> Closing your home for the summer
> Closing your home for the winter

> Frozen pipes
> How to install heat tape
> Spring home inspection
> Winterize your manufactured home

More Resources
> Buying and selling resources
> Decorating sites
> Manufacturers
> Manufactured Homes: The Market Facts 2002 Report
> Parts and supplies
> Park Manager Tool Kit

Replacing a Ceiling Panel

If you have a damaged ceiling panel, you don't need to replace the whole ceiling. You can piece or replace the spoiled panel. There are two types of manufactured home ceiling panels: fiberboard and textured gypsum wallboard. The wallboard is more widely available. (Be sure to fix the problem that caused the damaged panel before replacing it. See our section called "Identifying a Roof Leak.")

Here are some tips:

  • The panels installed in the factory are four feet wide and run the width of your manufactured home. You're not likely to find a panel that long, and if you did, it would be hard to handle. If the whole panel is ruined, replace it with two eight-foot panels cut to fit. Or, cut away the damaged area and add a new piece. It's a good idea to find someone to assist you because these panels are difficult to install alone.
  • Matching the texture and thickness of your panel is more important than matching the color. You can always paint the ceiling after you've installed the new panel.
  • You will also need to match the battens-the strips that cover the grooves between the panels.
  • If the damage was caused by water, the insulation must be dried out or replaced. While you have the ceiling open, you might want to add more insulation. If there is no vapor barrier between the insulation and the ceiling, add one. A vapor barrier protects against condensation moisture.
  • The ends of ceiling panels are installed between the sidewalls and the roof. You don't need to dig these ends out. Slice the ceiling panels at the wall edge. To support the new panel and cover the edge, add 1 x 2 molding strips that have been stained or painted.

Materials you will need:
Gypsum wallboard panel(s), 1 x 2 inch finished molding, rosettes, battens, 1 ¼ inch drywall screws, measuring tape, utility knife, straightedge, screwdriver or drill.

STEP 1: Before you Begin
If there is a ceiling fan or light, turn off power to the work area and remove the fixture.

STEP 2: Remove Trim
Pry off the batten and molding strip holding the damaged panel from the next panel. If there are rosettes fastening the panel to the roof truss, remove them.

 

STEP 3: Measure and Cut
Determine how much of the panel needs to be removed. Find the roof truss (these are spaced every 1 to 2 feet) and measure from the center of the truss to the wall. Or measure the full length, if you are removing the whole panel. With a utility knife and straightedge, cut new panel(s) to fit.

 

 

STEP 4: Remove Ceiling Panel
Using a utility knife and straightedge, cut the ceiling panel along the wall edges. Remove nails, staples or screws holding the panel to the roof truss. To remove less than a full panel, make your cut along the center of the truss.

STEP 5: Clean Truss Surface
Pull remaining nails and staples from the exposed roof trusses. The surface must be free of any protrusions or the new panel may bulge.

STEP 6: Install Panel(s)
Lift panel in place and secure the edge to the roof truss with 1 ¼ inch drywall screws. Secure to truss along wall edge as well.

STEP 7: Add Rosettes
To keep the panel from buckling in the middle, add a screw with a rosette every 18 inches along the center of roof trusses.

STEP 8: Add Battens and Molding
Attach battens between ceiling panels to cover the joints. Add molding along the wall edges.

Foremost PayOnline™ - Don't let your policy lapse due to late pay or cancellation. Choose Foremost PayOnline!
 
Foremost Mobile Home Insurance
 
 
 
E-mail this page to a friend  Set this page as your home page  Add this site to your favorites

Need to contact us? Send us a message.

Our Privacy Policy
© Copyright 2008 Foremost Insurance Company